| No |
Project |
Pipes' Diameter |
Pipes' Material |
Length |
Period of Execution |
Year |
| 1 |
Suez Canal Crossing No.1:
Water pipe under Suez Canal, Railway, West Road, Ismailia - Port Said Canal and East Road, with 40 m depth from water level.
|
36 inch |
H.D.P.E |
640 m |
30 Days |
1998 |
| 2 |
Suez Canal Crossing No.2:
Water pipe under Suez Canal, Railway, West Road, Ismailia - Port Said Canal and East Road, with 40 m depth from water level.
|
36 inch |
H.D.P.E |
640 m |
30 Days |
1998 |
| 3 |
Suez Canal Crossing No.3:
Water pipe under Suez Canal, Railway, West Road, Ismailia - Port Said Canal and East Road, with 40 m depth from water level.
|
36 inch |
H.D.P.E |
640 m |
30 Days |
1999 |
| 4 |
Suez Canal Crossing No.4:
High Pressure Gas pipe, with 40 m depth, under Suez Canal, Port Said - Ismailia Desert Road, Ismailia Canal, Railway, West Road and East Road.
|
36 inch |
Steel coated |
1200 m |
30 Days |
1999 |
| 5 |
Suez Canal Crossing No.5:
High Pressure Gas pipe, with 40 m depth, under Suez Canal, Port Said - Ismailia Desert Road, Ismailia Canal, Railway, West Road and East Road.
|
36 inch |
Steel coated |
1200 m |
30 Days |
1999 |
| 6 |
Suez Canal Crossing No.6:
3 collected High Pressure Gas pipe, with 40 m depth under Suez Canal, Port Said - Ismailia Desert Road, Ismailia Canal, Railway, West Road and East Road.
|
1x16 inch 2x12 inch |
Steel coated |
1200 m |
30 Days |
1999 |
| 7 |
Suez Canal Crossing No.7:
6'' Steel Sleeve pipe under Suez Canal with 40 m depth for laying fiber optics telephone cables.
|
6 inch |
Steel coated |
750 m |
10 Days |
2001 |
| 8 |
Suez Canal Crossing No.8:
28'' Water pipe under Suez Canal, with 41 m depth beside Ahmed Hamdy Tunnel at Km 142.850.
|
28 inch |
H.D.P.E |
680 m |
30 Days |
2002 |
| 9 |
Suez Canal Crossing No.9:
28'' Water pipe under Suez Canal, with 41 m depth beside Ahmed Hamdy Tunnel at Km 142.865.
|
28 inch |
H.D.P.E |
680 m |
30 Days |
2002 |
| 10 |
Suez Canal Crossing No.10:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
597 m |
15 Days |
2002 |
| 11 |
Suez Canal Crossing No.11:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
598 m |
15 Days |
2002 |
| 12 |
Suez Canal Crossing No.12:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
598 m |
15 Days |
2002 |
| 13 |
Suez Canal Crossing No.13:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
598 m |
15 Days |
2002 |
| 14 |
Suez Canal Crossing No.14:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
597 m |
15 Days |
2002 |
| 15 |
Suez Canal Crossing No.15:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
596 m |
15 Days |
2002 |
| 16 |
Suez Canal Crossing No.16:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
599 m |
15 Days |
2002 |
| 17 |
Suez Canal Crossing No.17:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
596 m |
15 Days |
2002 |
| 18 |
Suez Canal Crossing No.18:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
597 m |
15 Days |
2002 |
| 19 |
Suez Canal Crossing No.19:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
597 m |
15 Days |
2002 |
| 20 |
Suez Canal Crossing No.20:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
598 m |
15 Days |
2002 |
| 21 |
Suez Canal Crossing No.21:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
597 m |
15 Days |
2002 |
| 22 |
Suez Canal Crossing No.22:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
597 m |
15 Days |
2002 |
| 23 |
Suez Canal Crossing No.23:
Power Cables inside 12'' pipe under Suez Canal, Railway, Road and Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
598 m |
15 Days |
2002 |
| 24 |
Suez Canal Crossing No.24:
Two Fiber Optics Cables inside 12'' pipe under Suez Canal, Railway, Road, Canal with 40 m depth close to Port Said.
|
12 inch |
H.D.P.E |
597 m |
15 Days |
2002 |
| 25 |
Suez Canal Crossing No.25:
10'' Water pipe under Suez Canal, Railway, West Road, Ismailia - Port Said Canal, and East Road, with 40 m depth from water level at Km 137.300.
|
10 inch |
H.D.P.E |
676 m |
21 Days |
2004 |
| 26 |
Suez Canal Crossing No.26:
10'' Water pipe under Suez Canal, Railway, West Road, Ismailia - Port Said Canal, and East Road, with 40 m depth from water level at Km 90.200.
|
10 inch |
H.D.P.E |
642 m |
15 Days |
2004 |
| 27 |
Suez Canal Crossing No.27:
24'' Water pipe under Suez Canal, Railway, West Road and East Road, with 40 m depth from water level at Km 47.860.
|
24 inch |
H.D.P.E |
628 m |
15 Days |
2004 |
| 28 |
Suez Canal Crossing No.28:
24'' Water pipe under Suez Canal, Railway and Road with 32.4 m depth from water level at Km 3.900 Raswa.
|
24 inch |
H.D.P.E |
742 m |
30 Days |
2004 |
| 29 |
BTC Agsu Canal Crossing:
42'' Gas pipeline under Agsu Canal in Azerbaijan.
|
42 inch |
Steel coated |
535 m |
20 Days |
2004 |
| 30 |
SCP Agsu Canal Crossing:
42'' Gas pipeline under Agsu Canal in Azerbaijan.
|
42 inch |
Steel coated |
535 m |
15 Days |
2004 |
| 31 |
BTC Karabkh Canal Crossing:
42'' Gas pipeline under Karabakh Canal in Azerbaijan.
|
42 inch |
Steel coated |
651 m |
20 Days |
2004 |
| 32 |
SCP Karabkh Canal Crossing:
42'' Gas pipeline under Karabakh Canal in Azerbaijan.
|
42 inch |
Steel coated |
662 m |
15 Days |
2004 |
| 33 |
SCP Karabkh Canal Crossing:
42'' Gas pipeline under Karabakh Canal in Azerbaijan.
|
42 inch |
Steel coated |
703 m |
20 Days |
2004 |
| 34 |
SCP Chinny Village Crossing:
42'' Gas pipeline under Chinny Village in Azerbaijan.
|
42 inch |
Steel coated |
514 m |
15 Days |
2004 |
| 35 |
SCP Qurabyork Village Crossing:
42'' Gas pipeline under Qurabyork in Azerbaijan.
|
42 inch |
Steel coated |
1003 m |
45 Days |
2004 |
| 36 |
Suez Canal Crossing No.29:
6'' Fuel pipe under Suez Canal, with 43.50 m depth from water level at Km 73.300.
|
6 inch |
Steel coated |
700 m |
15 Days |
2004 |
| 37 |
Suez Canal Crossing No.30:
Power Cables inside four 10'' HDPE sub-duct inside 24'' HDPE pipe under Suez Canal, Railway and Road with 31.5 m depth from water level at Km 3.900 Raswa.
|
24 inch |
H.D.P.E |
735 m |
30 Days |
2004 |
| 38 |
Suez Canal Crossing No.31:
6'' Fuel pipe under Suez Canal, with 40.00 m depth from water level at Km 133.750.
|
6 inch |
Steel coated |
707 m |
19 Days |
2005 |
| 39 |
Suez Canal Crossing No.32:
24'' Water pipe under Suez Canal, Railway, West Road and East Road, with 44.55 m depth from water level at Km 47.850.
|
24 inch |
H.D.P.E |
645 m |
30 days |
2005 |
| 40 |
Suez Canal Crossing No.33:
6'' Fuel pipe under Suez Canal, West Road and East Road with 40.56 m depth from water level at Km 89.900.
|
6 inch |
Steel coated |
642 m |
18 days |
2005 |
| 41 |
Suez Canal Crossing No.34:
6'' Fuel pipe under Suez Canal and Road with 40.0 m depth from water level at Km 148.600.
|
6 inch |
Steel coated |
633 m |
13 days |
2005 |
| 42 |
Suez Canal Crossing No.35:
6'' Fuel pipe under Suez Canal, Railway, West Road and East Road with 40.0 m depth from water level at Km 50.200.
|
6 inch |
Steel coated |
665 m |
17 days |
2005 |
| 43 |
Suez Canal Crossing No.36:
10'' Water pipe under Suez Canal, Railway, West Road and East Road with 42.43 m depth from water level at Km 47.550.
|
6 inch |
H.D.P.E |
698 m |
15 days |
2005 |
| 44 |
Suez Canal Crossing No.37:
10'' Water pipe under Suez Canal and Road with 40.0 m depth from water level at Km 149.00.
|
6 inch |
H.D.P.E |
636 m |
13 days |
2005 |
| 45 |
Suez Canal Crossing No.38:
24'' Water pipe under Suez Canal, Railway, West Road and East Road, with 44.55 m depth from water level at Km 47.850.
|
24 inch |
H.D.P.E |
625 m |
30 days |
2005 |
| 46 |
Suez Canal Crossing No.39:
Power Cables inside 12'' pipe under Suez Canal, Railway, West Road, Canal and East Road, with 40.86 m depth from water level at km 43.433.
|
12 inch |
H.D.P.E |
717 m |
12 days |
2005 |
| 47 |
Suez Canal Crossing No.40:
Power Cables inside 12'' pipe under Suez Canal, Railway, West Road, Canal and East Road, with 41.46 m depth from water level at km 43.430.
|
12 inch |
H.D.P.E |
720 m |
12 days |
2005 |
| 48 |
Suez Canal Crossing No.41:
Power Cables inside 12'' pipe under Suez Canal, Railway, West Road, Canal and East Road, with 40.97 m depth from water level at km 43.427.
|
12 inch |
H.D.P.E |
722 m |
11 days |
2005 |
| 49 |
Suez Canal Crossing No.42:
Power Cables inside 12'' pipe under Suez Canal, Railway, West Road, Canal and East Road, with 41.26 m depth from water level at km 43.424.
|
12 inch |
H.D.P.E |
721 m |
8 days |
2005 |
| 50 |
Suez Canal Crossing No.43:
Power Cables inside 12'' pipe under Suez Canal, Railway, West Road, Canal and East Road, with 40.16 m depth from water level at km 43.421.
|
12 inch |
H.D.P.E |
722 m |
8 days |
2005 |
| 51 |
Suez Canal Crossing No.44:
Power Cables inside 12'' pipe under Suez Canal, Railway, West Road, Canal and East Road, with 40.96 m depth from water level at km 43.418.
|
12 inch |
H.D.P.E |
722 m |
8 days |
2005 |
| 52 |
Suez Canal Crossing No.45:
Power Cables inside 12'' pipe under Suez Canal, Railway, West Road, Canal and East Road, with 41.66 m depth from water level at km 43.415.
|
12 inch |
H.D.P.E |
722 m |
8 days |
2005 |
| 53 |
Blue Nile River Crossing:
32'' Gas pipeline under Blue Nile River in Sudan.
|
32 inch |
Steel coated |
640 m |
30 days |
2005 |